
West Point Gym Revitalization
125,000 square foot athletic facility revitalization. Led a master planning design charrette with stakeholders and coordinated with the State Historic Preservation Office for potential changes to this National Historic Landmark.

The Totality of Time Lusters the Dusk
Structural engineering support for the glass, Swarovski crystal, quartz, obsidian, onyx, hematite, paper, Plexiglas, wood, cement, lath, and mixed media sculpture by Lauren Fensterstock Exhibition at the Renwick Gallery of the Smithsonian American Art Museum in Washington, D.C.

St. Albans Custom House
Listed on the National Register of Historic Places, we conducted building-wide envelope and mechanical studies, emergency facade envelope assessments, office renovations and arc flash studies.

Portsmouth Naval Shipyard
$90M, 65,000 square-foot facility to support Virginia Class submarine work. Designed industrial ventilation to meet ATFP requirements. Created a 7-phase plan to coordinate multiple user group moves.

Austin-Bergstrom Airport
361 earth-toned, grounded, and suspended geometric-shaped sculptures with relief patterns designed by Michael Singer Studio. Patterns were derived from aerial imagery from throughout central Texas, abstracted and cast into concrete, with additions of copper, aluminum, Llano Uplift granite, and 256 LED lights. We conducted structural design for the 4,000+ linear feet of steel cable used to suspend the sculptures.